A PE license transfers from North Dakota to Ohio by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Ohio State Board of Registration for Professional Engineers and Surveyors, verify your North Dakota license, and meet Ohio's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Ohio requires no state-specific engineering exam for comity applicants (only professional surveyors must pass Ohio's two-hour state-specific surveying examination).

Verify this exact pair in the checker

Same data, interactive — with share link and board links.

Run the Reciprocity Checker →

Verdict

Licensure by endorsement

Ohio grants PE licensure by comity, so a Professional Engineer licensed in North Dakota does not start over — but does file a full Ohio application. Your North Dakota license, ABET degree, qualifying experience, and FE and PE results reach the Ohio State Board of Registration for Professional Engineers and Surveyors through your NCEES Record; the board's task is to confirm they meet Ohio's practice act, not to re-test you. FE and PE exam results transfer through your NCEES Record and are not retaken; Ohio requires no state-specific engineering exam for comity applicants (only professional surveyors must pass Ohio's two-hour state-specific surveying examination). Two things govern your timeline: keeping your North Dakota license active and unencumbered while the Ohio application is pending, and clearing any Ohio-specific exam or statutes review before the license issues.

What changes, North Dakota → Ohio

Side-by-side: North Dakota vs Ohio (Engineering (PE)), verified 2026-07-21
North Dakota (current)Ohio (destination)
Application fee$150 (N.D. Admin Code 28-02.1-10-02 sets the professional engineer registration fee at a maximum of $150, which applies to endorsement registration; the board publishes no separate comity fee. Transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES)$415 (Engineering reciprocity (comity) application fee from the board's published fee schedule; a $50 PE final registration fee is due on issuance and renewal is $40 per biennium. Transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES.)
Processing time6–8 weeks (Board states standard processing is 6-8 weeks from receipt of a completed application; an application from an applicant holding an NCEES Model Law designation is generally processed within 1-2 workdays)The board publishes no comity turnaround on a directly accessible page; comity applications are reviewed administratively once the out-of-state verification/NCEES Record is received (NCEES Record completion itself averages 2-3 weeks).
Licensing authorityNorth Dakota State Board of Registration for Professional Engineers and Land Surveyors (NDPELS)Ohio State Board of Registration for Professional Engineers and Surveyors

The destination column is what you must satisfy — Ohio sets the rules for this move.

Step by step

  1. Confirm Ohio's current requirements on the Ohio State Board of Registration for Professional Engineers and Surveyors website (linked below) — rules change.
  2. Submit the endorsement application to the Ohio State Board of Registration for Professional Engineers and Surveyors (application linked below).
  3. Arrange license verification from your current state via the verification system.
  4. Hold a current PE registration in good standing in another U.S. jurisdiction with qualifications equal to Ohio's standards (Ohio Admin. Code 4733-13-01; comity administered under R.C. Chapter 4796 universal license recognition).
  5. Submit verification/affidavit of your out-of-state registration; the board accepts an NCEES Record documenting education, exams, experience, and references.
  6. Hold a bachelor's degree from an EAC/ABET-accredited program plus four years of qualifying progressive experience (eight years for ETAC/ABET engineering-technology graduates).
  7. Show no record of disciplinary action against any license held.
  8. Pay the fees ($415 (Engineering reciprocity (comity) application fee from the board's published fee schedule; a $50 PE final registration fee is due on issuance and renewal is $40 per biennium. Transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES.)) and allow The board publishes no comity turnaround on a directly accessible page; comity applications are reviewed administratively once the out-of-state verification/NCEES Record is received (NCEES Record completion itself averages 2-3 weeks)..

Official links

Related guides

Frequently asked questions

Does Ohio accept a North Dakota PE license?

A PE license transfers from North Dakota to Ohio by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Ohio State Board of Registration for Professional Engineers and Surveyors, verify your North Dakota license, and meet Ohio's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Ohio requires no state-specific engineering exam for comity applicants (only professional surveyors must pass Ohio's two-hour state-specific surveying examination).

Do I retake the FE or PE exam moving from North Dakota to Ohio?

FE and PE exam results transfer through your NCEES Record and are not retaken; Ohio requires no state-specific engineering exam for comity applicants (only professional surveyors must pass Ohio's two-hour state-specific surveying examination).

What does the North Dakota-to-Ohio comity application cost?

$415 (Engineering reciprocity (comity) application fee from the board's published fee schedule; a $50 PE final registration fee is due on issuance and renewal is $40 per biennium. Transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES.).

Can I keep my North Dakota PE license after I'm licensed in Ohio?

Yes — PE licenses stack. Keep the North Dakota license active (its renewal and continuing-education/PDH clock run separately) and you hold both. Engineers working near state lines or nationally routinely carry several PE licenses at once, all sourced from a single NCEES Record.

Sources

Primary sources only — official boards and compact commissions. Data last verified 2026-07-21.

Reviewed by Billy Reiner, Editor · verified against primary sources 2026-07-21

How we verify · All sources · spot an error? [email protected]