Engineering License from Georgia to Florida: Does It Transfer? (2026)
Last verified: 2026-07-21 · source: Florida Board of Professional Engineers (FBPE) ↗
A PE license transfers from Georgia to Florida by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Florida Board of Professional Engineers (FBPE), verify your Georgia license, and meet Florida's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Florida licenses by endorsement (it explicitly does not license by reciprocity or comity) and, instead of a proctored state exam, requires completing the FBPE Laws and Rules Study Guide with a score of 90 percent or greater.
Verify this exact pair in the checker
Same data, interactive — with share link and board links.
Verdict
Licensure by endorsement
Florida grants PE licensure by comity, so a Professional Engineer licensed in Georgia does not start over — but does file a full Florida application. Your Georgia license, ABET degree, qualifying experience, and FE and PE results reach the Florida Board of Professional Engineers (FBPE) through your NCEES Record; the board's task is to confirm they meet Florida's practice act, not to re-test you. FE and PE exam results transfer through your NCEES Record and are not retaken; Florida licenses by endorsement (it explicitly does not license by reciprocity or comity) and, instead of a proctored state exam, requires completing the FBPE Laws and Rules Study Guide with a score of 90 percent or greater. Two things govern your timeline: keeping your Georgia license active and unencumbered while the Florida application is pending, and clearing any Florida-specific exam or statutes review before the license issues.
What changes, Georgia → Florida
| Georgia (current) | Florida (destination) | |
|---|---|---|
| Application fee | $100 ($100 Professional or Structural Engineer Application by Comity fee (non-refundable) per the board's official fee schedule, plus a $5 processing fee for each online submission; transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES) | $230 (Endorsement fee collected by DBPR, comprising the application fee, the initial licensure fee ($100, the only refundable portion), and an unlicensed-activity fee. Transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES) |
| Processing time | ~4 weeks (The Georgia SOS How-To Guide states comity applications are generally processed within about 20 business days (~4 weeks) of a complete application, evaluated in order received; a deficiency notice restarts the 20-day count) | FBPE publishes no endorsement turnaround; the board states that using an NCEES Record significantly speeds up the licensure process |
| Licensing authority | Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) | Florida Board of Professional Engineers (FBPE) |
The destination column is what you must satisfy — Florida sets the rules for this move.
Step by step
- Confirm Florida's current requirements on the Florida Board of Professional Engineers (FBPE) website (linked below) — rules change.
- Submit the endorsement application to the Florida Board of Professional Engineers (FBPE) (application linked below).
- Arrange license verification from your current state via the verification system.
- Hold a current, active PE license elsewhere and file the Application for Licensure as a Professional Engineer (endorsement).
- Have your FE and PE exam passage verified (using an NCEES Record significantly speeds up the process per the board).
- Hold an ABET-accredited engineering or engineering-technology degree (or a substantially equivalent evaluation) plus the qualifying experience in Rule 61G15-20.002, F.A.C.
- Complete the FBPE Laws and Rules Study Guide with a score of 90 percent or greater; provide a valid U.S. Social Security number and be at least 18.
- Pay the fees ($230 (Endorsement fee collected by DBPR, comprising the application fee, the initial licensure fee ($100, the only refundable portion), and an unlicensed-activity fee. Transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES)) and allow FBPE publishes no endorsement turnaround; the board states that using an NCEES Record significantly speeds up the licensure process.
Official links
Related guides
Frequently asked questions
Does Florida accept a Georgia PE license?
A PE license transfers from Georgia to Florida by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Florida Board of Professional Engineers (FBPE), verify your Georgia license, and meet Florida's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Florida licenses by endorsement (it explicitly does not license by reciprocity or comity) and, instead of a proctored state exam, requires completing the FBPE Laws and Rules Study Guide with a score of 90 percent or greater.
Do I retake the FE or PE exam moving from Georgia to Florida?
FE and PE exam results transfer through your NCEES Record and are not retaken; Florida licenses by endorsement (it explicitly does not license by reciprocity or comity) and, instead of a proctored state exam, requires completing the FBPE Laws and Rules Study Guide with a score of 90 percent or greater.
What does the Georgia-to-Florida comity application cost?
$230 (Endorsement fee collected by DBPR, comprising the application fee, the initial licensure fee ($100, the only refundable portion), and an unlicensed-activity fee. Transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES).
Can I keep my Georgia PE license after I'm licensed in Florida?
Yes — PE licenses stack. Keep the Georgia license active (its renewal and continuing-education/PDH clock run separately) and you hold both. Engineers working near state lines or nationally routinely carry several PE licenses at once, all sourced from a single NCEES Record.
Sources
Primary sources only — official boards and compact commissions. Data last verified 2026-07-21.
- FBPE - Licensure Process: Professional Engineers (endorsement, fee, Laws and Rules Study Guide) ↗ (accessed 2026-07-21)
- NCEES - Records Program (comity licensure) ↗ (accessed 2026-07-21)
- Georgia PELS Board — Fee Schedule (Rev. 3-4-2024): PE/SE Application by Comity $100 + $5 online processing ↗ (accessed 2026-07-21)
- Georgia SOS — How-To Guide: Professional Engineer Licensure ($100 comity fee; ~20 business days) ↗ (accessed 2026-07-21)
- NCEES — Georgia now requires NCEES Record for comity licensure ↗ (accessed 2026-07-21)
Reviewed by Billy Reiner, Editor · verified against primary sources 2026-07-21
How we verify · All sources · spot an error? [email protected]