Engineering License from Georgia to Arizona: Does It Transfer? (2026)
Last verified: 2026-07-21 · source: Arizona State Board of Technical Registration (AZBTR) ↗
A PE license transfers from Georgia to Arizona by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Arizona State Board of Technical Registration (AZBTR), verify your Georgia license, and meet Arizona's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Arizona has no state-specific engineering exam and no jurisprudence exam.
Verify this exact pair in the checker
Same data, interactive — with share link and board links.
Verdict
Licensure by endorsement
Arizona grants PE licensure by comity, so a Professional Engineer licensed in Georgia does not start over — but does file a full Arizona application. Your Georgia license, ABET degree, qualifying experience, and FE and PE results reach the Arizona State Board of Technical Registration (AZBTR) through your NCEES Record; the board's task is to confirm they meet Arizona's practice act, not to re-test you. FE and PE exam results transfer through your NCEES Record and are not retaken; Arizona has no state-specific engineering exam and no jurisprudence exam. Two things govern your timeline: keeping your Georgia license active and unencumbered while the Arizona application is pending, and clearing any Arizona-specific exam or statutes review before the license issues.
What changes, Georgia → Arizona
| Georgia (current) | Arizona (destination) | |
|---|---|---|
| Application fee | $100 ($100 Professional or Structural Engineer Application by Comity fee (non-refundable) per the board's official fee schedule, plus a $5 processing fee for each online submission; transmitting an NCEES Record costs $175 for the first board and $100 for each additional board, paid separately to NCEES) | $325 ($325 combined application and initial registration fee ($100 application + $225 registration, the same structure AZBTR uses for other individual registrations), payable by check/money order/credit card to AZBTR; the same amount applies to the Reciprocity/Endorsement, Universal Licensure, and Traditional pathways. Transmitting an NCEES Record costs $175 first board / $100 each additional, paid separately to NCEES. See verification note re: a $445 figure recorded in a prior draft) |
| Processing time | ~4 weeks (The Georgia SOS How-To Guide states comity applications are generally processed within about 20 business days (~4 weeks) of a complete application, evaluated in order received; a deficiency notice restarts the 20-day count) | No published turnaround; board staff (and/or volunteer registrant reviewers) verify the application and forward it to the full Board only in rare instances. An application is not reviewed until administratively complete (all verifications received) |
| Licensing authority | Georgia State Board of Registration for Professional Engineers and Land Surveyors (Georgia PELS Board) | Arizona State Board of Technical Registration (AZBTR) |
The destination column is what you must satisfy — Arizona sets the rules for this move.
Step by step
- Confirm Arizona's current requirements on the Arizona State Board of Technical Registration (AZBTR) website (linked below) — rules change.
- Submit the endorsement application to the Arizona State Board of Technical Registration (AZBTR) (application linked below).
- Arrange license verification from your current state via the verification system.
- Reciprocity/Endorsement pathway: hold an NCEES Model Law Engineer (MLE) designation and an active license in another jurisdiction, plus four years of experience after that licensure.
- Applicants without an MLE can still qualify through the Traditional pathway (eight years of combined engineering education/experience with the FE and PE passed).
- Arizona residents licensed elsewhere may use an expedited Universal Licensure pathway.
- Demonstrate competency in the branch of engineering sought through education, examination, or experience.
- Pay the fees ($325 ($325 combined application and initial registration fee ($100 application + $225 registration, the same structure AZBTR uses for other individual registrations), payable by check/money order/credit card to AZBTR; the same amount applies to the Reciprocity/Endorsement, Universal Licensure, and Traditional pathways. Transmitting an NCEES Record costs $175 first board / $100 each additional, paid separately to NCEES. See verification note re: a $445 figure recorded in a prior draft)) and allow No published turnaround; board staff (and/or volunteer registrant reviewers) verify the application and forward it to the full Board only in rare instances. An application is not reviewed until administratively complete (all verifications received).
Official links
Related guides
Frequently asked questions
Does Arizona accept a Georgia PE license?
A PE license transfers from Georgia to Arizona by endorsement — there is no automatic reciprocity, but you do not start over. Apply to the Arizona State Board of Technical Registration (AZBTR), verify your Georgia license, and meet Arizona's endorsement requirements. FE and PE exam results transfer through your NCEES Record and are not retaken; Arizona has no state-specific engineering exam and no jurisprudence exam.
Do I retake the FE or PE exam moving from Georgia to Arizona?
FE and PE exam results transfer through your NCEES Record and are not retaken; Arizona has no state-specific engineering exam and no jurisprudence exam.
What does the Georgia-to-Arizona comity application cost?
$325 ($325 combined application and initial registration fee ($100 application + $225 registration, the same structure AZBTR uses for other individual registrations), payable by check/money order/credit card to AZBTR; the same amount applies to the Reciprocity/Endorsement, Universal Licensure, and Traditional pathways. Transmitting an NCEES Record costs $175 first board / $100 each additional, paid separately to NCEES. See verification note re: a $445 figure recorded in a prior draft).
Can I keep my Georgia PE license after I'm licensed in Arizona?
Yes — PE licenses stack. Keep the Georgia license active (its renewal and continuing-education/PDH clock run separately) and you hold both. Engineers working near state lines or nationally routinely carry several PE licenses at once, all sourced from a single NCEES Record.
Sources
Primary sources only — official boards and compact commissions. Data last verified 2026-07-21.
- Arizona BTR — Engineer Applicants (reciprocity/endorsement & universal-licensure pathways) ↗ (accessed 2026-07-21)
- Arizona BTR — Engineer Registration Instructions (application + initial registration fee $325) ↗ (accessed 2026-07-21)
- Arizona BTR — Fee Schedule (R4-30-106 service fees; licensing fees authorized by A.R.S. 32-124) ↗ (accessed 2026-07-21)
- NCEES — Records Program (comity transmittal fees) ↗ (accessed 2026-07-21)
- Georgia PELS Board — Fee Schedule (Rev. 3-4-2024): PE/SE Application by Comity $100 + $5 online processing ↗ (accessed 2026-07-21)
- Georgia SOS — How-To Guide: Professional Engineer Licensure ($100 comity fee; ~20 business days) ↗ (accessed 2026-07-21)
- NCEES — Georgia now requires NCEES Record for comity licensure ↗ (accessed 2026-07-21)
Reviewed by Billy Reiner, Editor · verified against primary sources 2026-07-21
How we verify · All sources · spot an error? [email protected]